CTC Boiler Installation

Published Categorised as Biomass, Case Studies

This recently commissioned biomass installation using the CTC Ecotec 15kW boiler coupled with a 500l EcoZenith thermal store in the Scottish borders. The boiler has a manually fed hopper which holds 400kg of pellets for reduced loading frequency. The boiler requires ash removal every 8 weeks and manual cleaning every 2 to 3 months. Hot water is provided directly from the thermal store together with 2 heating circuits incorporating weather compensated control. The building heat load is 24000kWhrs with an estimated pellet consumption of 6 – 7 tonnes.

CTC Boilerhouse