Evacuated Tubes- Dunbar inbetween January snow showers.

The final evacuated tube being fitted to the manifold on this 30 tube system in Dunbar in between snow showers on a brisk January day.

The collectors are connected via a pump station to a 300l unvented cylinder with twin coil, gas as the primary fuel source.

The project was part funded by the Be Green organisation in Dunbar via Community Windpower ScotlandEvacuated Tubes

This entry was posted in Case Studies, Solar Thermal. Bookmark the permalink.