{"id":1060,"date":"2014-01-30T17:29:50","date_gmt":"2014-01-30T17:29:50","guid":{"rendered":"http:\/\/lothianrenewables.co.uk\/?p=1060"},"modified":"2024-10-31T09:52:26","modified_gmt":"2024-10-31T09:52:26","slug":"flat-roof-pv-by-reca","status":"publish","type":"post","link":"https:\/\/lothianrenewables.co.uk\/?p=1060","title":{"rendered":"Flat Roof PV by RECA"},"content":{"rendered":"<figure id=\"attachment_1061\" aria-describedby=\"caption-attachment-1061\" style=\"width: 300px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/lothianrenewables.co.uk\/files\/2014\/01\/RECAFLATROOFPIC.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-1061\" alt=\"RECA flat roof system before panels fitted\" src=\"http:\/\/lothianrenewables.co.uk\/files\/2014\/01\/RECAFLATROOFPIC-300x225.jpg\" width=\"300\" height=\"225\" srcset=\"https:\/\/lothianrenewables.co.uk\/files\/2014\/01\/RECAFLATROOFPIC-300x225.jpg 300w, https:\/\/lothianrenewables.co.uk\/files\/2014\/01\/RECAFLATROOFPIC-1024x768.jpg 1024w, https:\/\/lothianrenewables.co.uk\/files\/2014\/01\/RECAFLATROOFPIC.jpg 1632w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-1061\" class=\"wp-caption-text\">RECA flat roof system before panels fitted<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<dl class=\"wp-caption alignleft\" id=\"attachment_1072\" style=\"width: 235px\">\n<dt class=\"wp-caption-dt\"><\/dt>\n<dd class=\"wp-caption-dd\">The Completed install.<\/dd>\n<\/dl>\n<p>Work began today on a combined pitched roof and flat roof PV system. After confirming from a structural report that the roof was satisfactory for a ballasted flat roof system the <a title=\"RECA Flat Roof PV Mount\" href=\"http:\/\/www.reca-pv.co.uk\/\">RECA <\/a>Low ballast system was specified. The picture above shows the initial layout, orientated to point south. The system will be completed early February and further pictures will be posted to show the completed array. The RECA frames are enclosed to deflect wind and require far less ballast than traditional ballasted systems.<\/p>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_1072\" aria-describedby=\"caption-attachment-1072\" style=\"width: 225px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/lothianrenewables.co.uk\/files\/2014\/01\/Reca-flat-roof-with-Suntallite-All-Black.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-1072\" alt=\"The Completed install.\" src=\"http:\/\/lothianrenewables.co.uk\/files\/2014\/01\/Reca-flat-roof-with-Suntallite-All-Black-225x300.jpg\" width=\"225\" height=\"300\" srcset=\"https:\/\/lothianrenewables.co.uk\/files\/2014\/01\/Reca-flat-roof-with-Suntallite-All-Black-225x300.jpg 225w, https:\/\/lothianrenewables.co.uk\/files\/2014\/01\/Reca-flat-roof-with-Suntallite-All-Black-768x1024.jpg 768w, https:\/\/lothianrenewables.co.uk\/files\/2014\/01\/Reca-flat-roof-with-Suntallite-All-Black.jpg 1224w\" sizes=\"auto, (max-width: 225px) 100vw, 225px\" \/><\/a><figcaption id=\"caption-attachment-1072\" class=\"wp-caption-text\">The Completed install, Suntallite All Black Panels<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; The Completed install. Work began today on a combined pitched roof and flat roof PV system. After confirming from a structural report that the roof was satisfactory for a ballasted flat roof system the RECA Low ballast system was specified. The picture above shows the initial layout, orientated to point south. The system will&hellip; <a class=\"more-link\" href=\"https:\/\/lothianrenewables.co.uk\/?p=1060\">Continue reading <span class=\"screen-reader-text\">Flat Roof PV by RECA<\/span><\/a><\/p>\n","protected":false},"author":555,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4,9],"tags":[],"class_list":["post-1060","post","type-post","status-publish","format-standard","hentry","category-case-studies","category-solar-pv","entry"],"_links":{"self":[{"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/1060","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=\/wp\/v2\/users\/555"}],"replies":[{"embeddable":true,"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1060"}],"version-history":[{"count":0,"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/1060\/revisions"}],"wp:attachment":[{"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1060"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1060"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1060"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}