{"id":1228,"date":"2015-02-04T21:21:25","date_gmt":"2015-02-04T21:21:25","guid":{"rendered":"http:\/\/lothianrenewables.co.uk\/?p=1228"},"modified":"2024-10-31T09:52:19","modified_gmt":"2024-10-31T09:52:19","slug":"december-rhi-uptake-figures","status":"publish","type":"post","link":"https:\/\/lothianrenewables.co.uk\/?p=1228","title":{"rendered":"December 2014 RHI Uptake figures (closed)"},"content":{"rendered":"<p><a href=\"https:\/\/lothianrenewables.co.uk\/files\/2015\/02\/RHI-Figures-2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-1229\" src=\"https:\/\/lothianrenewables.co.uk\/files\/2015\/02\/RHI-Figures-2-262x300.jpg\" alt=\"RHI Figures (2)\" width=\"262\" height=\"300\" srcset=\"https:\/\/lothianrenewables.co.uk\/files\/2015\/02\/RHI-Figures-2-262x300.jpg 262w, https:\/\/lothianrenewables.co.uk\/files\/2015\/02\/RHI-Figures-2.jpg 839w\" sizes=\"auto, (max-width: 262px) 100vw, 262px\" \/><\/a>The DECC Monthly Reports released on 30th January for RHI show that the level of applications for Domestic RHI is above the super trigger &#8211; if the forecast expenditure remains at the same growth rate, then the biomass tariff will be degressed by 20% for applications from 1st April, from 10.98 to 8.78p\/kWh.<\/p>\n<p>For the Non-Domestic RHI the small biomass band has again hit its individual trigger, with current growth figures strongly suggesting<br \/>\na 10% degression (+5% if total RHI tri<span class=\"text_exposed_show\">gger being hit) as of 1st April. The medium (200kWth-999kWth) and large biomass (1MWth+) tariffs are unlikely to be degressed,<\/span><\/p>\n<div class=\"text_exposed_show\">\n<p>The final degression decisions will be announced in the next quarterly assessment, released 27th February.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The DECC Monthly Reports released on 30th January for RHI show that the level of applications for Domestic RHI is above the super trigger &#8211; if the forecast expenditure remains at the same growth rate, then the biomass tariff will be degressed by 20% for applications from 1st April, from 10.98 to 8.78p\/kWh. For the&hellip; <a class=\"more-link\" href=\"https:\/\/lothianrenewables.co.uk\/?p=1228\">Continue reading <span class=\"screen-reader-text\">December 2014 RHI Uptake figures (closed)<\/span><\/a><\/p>\n","protected":false},"author":555,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10,1],"tags":[],"class_list":["post-1228","post","type-post","status-publish","format-standard","hentry","category-biomass","category-news","entry"],"_links":{"self":[{"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/1228","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=\/wp\/v2\/users\/555"}],"replies":[{"embeddable":true,"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1228"}],"version-history":[{"count":1,"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/1228\/revisions"}],"predecessor-version":[{"id":1351,"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/1228\/revisions\/1351"}],"wp:attachment":[{"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1228"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1228"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1228"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}