{"id":347,"date":"2012-05-08T11:32:30","date_gmt":"2012-05-08T10:32:30","guid":{"rendered":"http:\/\/ourlocality.org\/lothianrenewables\/?p=347"},"modified":"2024-10-31T09:52:45","modified_gmt":"2024-10-31T09:52:45","slug":"enecsys-micro-inverter","status":"publish","type":"post","link":"https:\/\/lothianrenewables.co.uk\/?p=347","title":{"rendered":"Enecsys micro inverter"},"content":{"rendered":"<p><a href=\"http:\/\/ourlocality.org\/lothianrenewables\/files\/2012\/05\/enecsys-solar-inverter.png\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/ourlocality.org\/lothianrenewables\/files\/2012\/05\/enecsys-solar-inverter-150x150.png\" alt=\"Enecsys solar inverter\" title=\"Enecsys solar inverter\" width=\"150\" height=\"150\" class=\"alignright size-thumbnail wp-image-348\" \/><\/a>A close up view of an Enecsys micro inverter. On this system each PV panel is connected to an individual inverter to give the best possible yield from the array. Remote access via the Internet allows performance data to be viewed from any location.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A close up view of an Enecsys micro inverter. On this system each PV panel is connected to an individual inverter to give the best possible yield from the array. Remote access via the Internet allows performance data to be viewed from any location.<\/p>\n","protected":false},"author":555,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4,9],"tags":[],"class_list":["post-347","post","type-post","status-publish","format-standard","hentry","category-case-studies","category-solar-pv","entry"],"_links":{"self":[{"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/347","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=\/wp\/v2\/users\/555"}],"replies":[{"embeddable":true,"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=347"}],"version-history":[{"count":0,"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/347\/revisions"}],"wp:attachment":[{"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=347"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=347"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=347"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}