{"id":673,"date":"2012-07-02T12:14:11","date_gmt":"2012-07-02T11:14:11","guid":{"rendered":"http:\/\/lothianrenewables.co.uk\/?p=673"},"modified":"2024-10-31T09:52:42","modified_gmt":"2024-10-31T09:52:42","slug":"happy-with-pv","status":"publish","type":"post","link":"https:\/\/lothianrenewables.co.uk\/?p=673","title":{"rendered":"Happy With PV"},"content":{"rendered":"<p><a href=\"http:\/\/lothianrenewables.co.uk\/files\/2012\/07\/5-more.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-674\" title=\"5 more!\" src=\"http:\/\/lothianrenewables.co.uk\/files\/2012\/07\/5-more-300x224.jpg\" alt=\"\" width=\"300\" height=\"224\" srcset=\"https:\/\/lothianrenewables.co.uk\/files\/2012\/07\/5-more-300x224.jpg 300w, https:\/\/lothianrenewables.co.uk\/files\/2012\/07\/5-more-1024x764.jpg 1024w, https:\/\/lothianrenewables.co.uk\/files\/2012\/07\/5-more.jpg 1296w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a>A recently commissioned 5 panel system on a metal roof. Having over a year ago installed the first 5 panels Lothian Renewables were asked to install a further 5. The customer has been very happy with the performance of the initial system and wanted to increase the size. With the change in tariff rates in April the recent installation required a separate new generation meter to record kW produced with 2 meter readings now being provided to the FITs supplier.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A recently commissioned 5 panel system on a metal roof. Having over a year ago installed the first 5 panels Lothian Renewables were asked to install a further 5. The customer has been very happy with the performance of the initial system and wanted to increase the size. With the change in tariff rates in&hellip; <a class=\"more-link\" href=\"https:\/\/lothianrenewables.co.uk\/?p=673\">Continue reading <span class=\"screen-reader-text\">Happy With PV<\/span><\/a><\/p>\n","protected":false},"author":555,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-673","post","type-post","status-publish","format-standard","hentry","category-case-studies","entry"],"_links":{"self":[{"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/673","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=\/wp\/v2\/users\/555"}],"replies":[{"embeddable":true,"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=673"}],"version-history":[{"count":0,"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/673\/revisions"}],"wp:attachment":[{"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=673"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=673"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=673"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}