{"id":844,"date":"2012-12-06T19:46:50","date_gmt":"2012-12-06T19:46:50","guid":{"rendered":"http:\/\/lothianrenewables.co.uk\/?p=844"},"modified":"2024-10-31T09:52:33","modified_gmt":"2024-10-31T09:52:33","slug":"no-changeto-feed-in-tariff","status":"publish","type":"post","link":"https:\/\/lothianrenewables.co.uk\/?p=844","title":{"rendered":"No ChangeTo Feed In Tariff"},"content":{"rendered":"<p><a href=\"http:\/\/lothianrenewables.co.uk\/files\/2012\/12\/returnoninvestment1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-846\" src=\"http:\/\/lothianrenewables.co.uk\/files\/2012\/12\/returnoninvestment1.jpg\" alt=\"\" width=\"257\" height=\"196\" \/><\/a>Ofgem has confirmed today\u00a0the feed-in tariff (FiT) rates for solar photovoltaic technology beginning February 1, 2013. The rates will remain the same as they have been since 1 st November at 15.44p until at least May next year.<\/p>\n<p>&nbsp;<\/p>\n<p>With 4kW systems costing from \u00a35200 to install and on south facing roofs the annual total financial benefit being circa \u00a3800, solar PV remains an excellent investment both financially and environmentally.<\/p>\n<p>The new FiT rates, as of 1 February, 2013, will be as follows:<\/p>\n<table border=\"1\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td><strong>Description<\/strong><\/td>\n<td><strong>FiT rate p\/kWh<\/strong><\/td>\n<\/tr>\n<tr>\n<td>0-4kW<\/td>\n<td>15.44p<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Ofgem has confirmed today\u00a0the feed-in tariff (FiT) rates for solar photovoltaic technology beginning February 1, 2013. The rates will remain the same as they have been since 1 st November at 15.44p until at least May next year. &nbsp; With 4kW systems costing from \u00a35200 to install and on south facing roofs the annual total&hellip; <a class=\"more-link\" href=\"https:\/\/lothianrenewables.co.uk\/?p=844\">Continue reading <span class=\"screen-reader-text\">No ChangeTo Feed In Tariff<\/span><\/a><\/p>\n","protected":false},"author":555,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-844","post","type-post","status-publish","format-standard","hentry","category-news","entry"],"_links":{"self":[{"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/844","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=\/wp\/v2\/users\/555"}],"replies":[{"embeddable":true,"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=844"}],"version-history":[{"count":0,"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/844\/revisions"}],"wp:attachment":[{"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=844"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=844"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lothianrenewables.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=844"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}