The final evacuated tube being fitted to the manifold on this 30 tube system in Dunbar in between snow showers on a brisk January day.
The collectors are connected via a pump station to a 300l unvented cylinder with twin coil, gas as the primary fuel source.
The project was part funded by the Be Green organisation in Dunbar via Community Windpower Scotland